Malaysian Flying Academy (CTRM)
Contractor : Spec Bina dan Struktor S/B
Volume : 8,000m3
Project : Malaysian Flying Academy at Batu Berendam (CTRM)
Duration : 3 months
Contractor : Spec Bina dan Struktor S/B
Volume : 8,000m3
Project : Malaysian Flying Academy at Batu Berendam (CTRM)
Duration : 3 months